Overview

B&H Construction completed a 22-mile horizontal directional drilling (HDD) installation through dense rock formations and an extremely tight highway right-of-way in Texas after the project transitioned from a mixed open-cut approach to a fully trenchless installation. Utilizing multiple HDD rigs, advanced rock-boring methods, and coordinated utility construction operations, B&H successfully installed critical underground pipeline infrastructure while maintaining active traffic flow and minimizing environmental impact. Through rapid mobilization and precision directional drilling execution, the project was completed safely, efficiently, and ahead of schedule in several segments despite challenging geological and logistical conditions.

project scope:

• Long-distance horizontal directional drilling (HDD)
• Dense rock directional boring
• Highway right-of-way utility installation
• Multi-rig HDD operations
• Underground pipeline installation
• Real-time bore steering and tracking
• Environmental and traffic coordination
• Site restoration and compliance management

‍

project partners:

• Texas Utility Infrastructure Developers
• Highway and Environmental Coordination Teams

‍

industry type:

Large-Scale Trenchless Pipeline Infrastructure

‍

project location:

Texas

Proof Points