Commercial Vertical Geothermal Well Installation – Central Oklahoma

Overview
B&H Construction completed a commercial vertical geothermal well installation for a high-usage property in Central Oklahoma, delivering a highly efficient geothermal HVAC infrastructure solution designed to reduce long-term energy costs and improve sustainability. The project included precision vertical drilling, HDPE closed-loop piping installation, thermal grouting, and full geothermal well field integration for a large-scale commercial HVAC system. By utilizing advanced geothermal drilling methods, B&H minimized site disruption while delivering reliable year-round heating and cooling performance for the client.
project scope:
• Commercial geothermal well drilling
• Vertical borehole installation
• HDPE U-bend loop piping installation
• Thermal grouting operations
• Geothermal well field construction
• Pressure testing and manifolding
• Trenching and utility integration
• Site restoration and cleanup
project partners:
• Central Oklahoma Commercial Property Client
• Commercial HVAC Integration Team
industry type:
Commercial Geothermal Infrastructure
project location:
Central Oklahoma
industry:
Proof Points




