Projects

Directional Drilling for Renewable Energy Pipeline Installation

Directional Drilling for Renewable Energy Pipeline Installation

Overview

B&H Construction completed a precision horizontal directional drilling (HDD) installation supporting a renewable energy infrastructure project requiring critical underground pipeline crossings beneath a state highway and environmentally sensitive areas. The project involved a 1,200-foot directional drill bore designed to install high-pressure steel and poly pipeline infrastructure while minimizing environmental impact and avoiding surface disruption. Through rapid mobilization, advanced HDD technology, and precise underground utility construction practices, B&H successfully delivered the project ahead of schedule and enabled on-time commercial operations for the renewable energy facility.

project scope:

• Horizontal directional drilling (HDD)
• Renewable energy pipeline installation
• Highway and wetland utility crossings
• Steel and poly pipe installation
• Underground utility coordination
• Pipeline integrity testing
• Environmental protection and restoration
• Regulatory compliance management

‍

project partners:

• Renewable Natural Gas Facility Developers
• Regional Utility and Infrastructure Teams

‍

industry type:

Renewable Energy Pipeline Infrastructure

‍

project location:

Midwest Region

Proof Points

01

Safety and regulatory compliance focus

02

Multi-state operational experience

03

Certified crews and documented QA/QC