Trenchless Sewer Pipe Installation – Oklahoma City

Overview
B&H Construction completed a 1,200-foot trenchless sewer grade pipe installation in the Oklahoma City metro using advanced horizontal directional drilling (HDD) technology. The project crossed beneath major roadways, existing utilities, and environmentally sensitive areas while minimizing surface disruption and avoiding traditional open-cut trenching methods. By utilizing precision HDD methods, B&H delivered a cost-effective underground utility solution with reduced traffic impacts, faster completion timelines, and long-term system reliability.
project scope:
• Utility coordination and site planning
• HDD pilot bore installation
• Bore reaming operations
• HDPE sewer pipe pullback
• Precision tracking and alignment
• Testing and commissioning
• Surface restoration and cleanup
project partners:
• Oklahoma City Metro Municipality
• Local Utility Stakeholders
industry type:
Municipal Sewer Infrastructure
project location:
Oklahoma City Metro Area, Oklahoma
Proof Points




